Civil Hospital

Strasbourg (57), France

Project owner:
Hôpitaux universitaires de Strasbourg

Assistant project owner:
SCIC Développement

Project manager:

Cabinet Claude Vasconi

Surface:

  • Habitable surface area 90,800 m2
  • SDO 83,600 m2
  • Number of beds 712

AN EXCEPTIONAL SITE
With 21,000 m2 of glass, the new Strasbourg Civil Hospital was the largest construction site in France during 2004/2005